steam

Emergency boiler failure: what to do in the first hour and how to get heat back online faster.

By |2026-09-22T10:13:10-05:00September 22nd, 2026|Industry Perspective|

A boiler failure during heating season is not a maintenance problem. It is an operations problem. The building is cold, the occupants are calling, and the decisions made in the first hour determine how quickly heat comes back online and how much the recovery costs. Most facility managers have never managed a boiler failure before

Hurst boiler controls and burner management systems: what modern control systems provide and why they matter.

By |2026-09-15T10:20:13-05:00September 15th, 2026|Industry Perspective|

A commercial or industrial boiler is only as reliable, efficient, and safe as the control system managing it. The burner, the heat exchanger, and the pressure vessel are the hardware. The control system is what determines whether that hardware operates correctly, responds appropriately to changing conditions, protects itself and the building when something goes wrong,

Sellers Manufacturing: deaerators, single pass fire tube, boiler feed systems, and the industrial steam applications most boiler reps walk past.

By |2026-09-08T09:33:09-05:00September 8th, 2026|Industry Perspective|

Most commercial boiler reps focus on the boiler. The equipment that makes the boiler work correctly, the deaerator that removes oxygen from the feedwater, the boiler feed system that delivers that water to the boiler at the right pressure and temperature, the condensate return unit that recovers and recycles steam condensate, receives less attention in

Boiler water treatment before heating season: what the chemistry needs to look like before the first firing.

By |2026-09-01T08:49:18-05:00September 1st, 2026|Industry Perspective|

The pre-season boiler inspection covers the mechanical side of the system. Combustion analysis, safety control testing, heat transfer surface inspection, breeching review, and controls verification. All of it matters. None of it accounts for what is happening in the water. A boiler that is mechanically sound and chemically neglected will develop scale, corrosion, and oxygen

The Hurst Boiler product family: from 6 HP to 4,500 HP and where each product fits.

By |2026-08-25T09:18:56-05:00August 25th, 2026|Industry Perspective|

Hurst Boiler and Welding Company has been manufacturing commercial and industrial boilers since 1967. The product line has expanded considerably since then, covering fire tube, watertube, biomass, solid fuel, and hybrid configurations across a capacity range that spans from small commercial applications through the largest industrial steam plants. For engineers and facility managers evaluating a

Steam system startup for industrial facilities: what process steam requires that commercial heating does not.

By |2026-08-18T08:43:20-05:00August 18th, 2026|Industry Perspective|

A commercial heating boiler that has been offline for the summer starts up in a straightforward sequence. Verify the controls, confirm the water level, fire the burner, bring the system to temperature. The building is warm. The process is largely the same every year. An industrial steam system startup is a different exercise. Process steam

The GP Energy boiler room resource guide: everything you need before the specification is written.

By |2026-08-11T09:33:57-05:00August 11th, 2026|Industry Perspective|

The commercial boiler specification process involves more decisions than most facility managers and engineers expect when they start one. The boiler itself is one decision. The breeching and stack system is another. The efficiency rating on the specification sheet needs to be interpreted correctly to mean anything useful. The control system needs to match the

The commercial boiler pre-season startup checklist: what to verify before heating season begins.

By |2026-08-04T08:28:52-05:00August 3rd, 2026|Industry Perspective|

October is not the time to find out your boiler has a problem. By October the heating season has started, the service schedule is filling up, and the options for addressing a problem narrow significantly when the building needs heat. The facility managers who avoid that situation are the ones who scheduled their pre-season inspection

The Hurst Series 500: why the four-pass wetback design matters for commercial and industrial steam applications.

By |2026-07-29T13:57:11-05:00July 29th, 2026|Industry Perspective|

Most commercial and industrial boiler specifications focus on capacity, efficiency, and fuel type. The internal design of the boiler, specifically how the combustion gases travel through the heat exchanger before exiting through the flue, gets less attention in the specification conversation and more attention in the service room years later when someone is trying to

Pre-season boiler inspection: what to check before heating season starts.

By |2026-07-21T08:26:03-05:00July 21st, 2026|Industry Perspective|

The window between now and the first cold snap is shorter than it looks on the calendar. Facilities that schedule boiler inspections in July and August get the work done on their terms. Facilities that wait until October are competing for service time with everyone else who also waited, and they are doing it with