Monthly Archives: July 2026

The Hurst Series 500: why the four-pass wetback design matters for commercial and industrial steam applications.

By |2026-07-29T13:57:11-05:00July 29th, 2026|Industry Perspective|

Most commercial and industrial boiler specifications focus on capacity, efficiency, and fuel type. The internal design of the boiler, specifically how the combustion gases travel through the heat exchanger before exiting through the flue, gets less attention in the specification conversation and more attention in the service room years later when someone is trying to

Pre-season boiler inspection: what to check before heating season starts.

By |2026-07-21T08:26:03-05:00July 21st, 2026|Industry Perspective|

The window between now and the first cold snap is shorter than it looks on the calendar. Facilities that schedule boiler inspections in July and August get the work done on their terms. Facilities that wait until October are competing for service time with everyone else who also waited, and they are doing it with

How to read a boiler efficiency rating and what it actually means for your facility.

By |2026-07-14T08:03:31-05:00July 14th, 2026|Industry Perspective|

Boiler efficiency ratings appear on every product specification sheet, every proposal, and every manufacturer comparison chart. They are also one of the most consistently misunderstood numbers in commercial mechanical system selection. A facility manager or engineer who takes a boiler efficiency rating at face value without understanding what it measures, under what conditions, and how

The Unilux 5-pass watertube boiler: built for applications where fire tube runs out of answers.

By |2026-07-07T10:01:07-05:00July 7th, 2026|Industry Perspective|

Fire tube boilers are the right answer for a lot of commercial applications. They are well understood, widely available, and when the load is right they do exactly what they are supposed to do. But fire tube has a ceiling. Capacity, pressure, thermal stress tolerance, and long-term durability all have limits that start to matter